PROJECT DESCRIPTION
Work will be carried out on nearly 540 km of distribution lines and electrical substations (approximately 900 MVA). The project will contribute to the connection and transmission of electricity generated by renewable energy plants, thus relieving pressure on the existing grid. In addition, it will improve the quality of electricity supply for end users and reduce technical losses. A total of 630 MW of renewable energy is expected to be connected to the distribution network, replacing part of the fossil generation (estimated at 1 TWh). Adding the reduction of technical losses, the reduction of CO2 emissions is estimated at 68ktCO2eq per year.