Showing 1-10 of 34 Export Projects Click here to download the selected projects in excel format. You may adapt the selection by applying the filters on the left. Show 10 25 50 100 Sort by
The plant will use Reciprocating Internal Combustion Engine (RICE) technology to replace an old coal power plant. It will provide flexibility to the power system, support the integration of renewable energy.
The role and function of the pumped storage power plant is storing power in off-peak time at night and generating power in peak time, so it can adjust the balance of supply /demand and reduce the demand difference between peak and off-peak time. In general, PSPP is capable of flattening the load curve
Construction of the Bac Ai pump storage hydropower plant of 1200MW - the first pump storage of its kind in Vietnam. The project will be used as reservice capacities for the Vietnamese power system, thus reinforcing its stability, regulating daily loads and supporting the integration of new renewables into the system.
Project preparatory technical assistance reports are provided for small-scale technical assistance that identify, formulate, and prepare development projects.
The project promotes the development of transmission capacities in the provinces close to Ho-Chi-Minh-city and includes a number of investment projects at 500kV level (substations and transmission lines). The projects under AFD's financing aim at strengthening EVNNPT's transmission capacities in the provinces by reinforcing the current system, improving its reliability and efficiency.
Capacity building, strategic orientation, corporate renewal and restructuring, training and other support to EVN in terms of just energy transition towards decarbonization
The forum will discuss the energy transition of Vietnam and Australia and introduce new energy technologies and solutions from Australia.
The project supports EVN and its subsidiary in the fields of smart grid and digitalization.
Improve, build, extend the 110kV grid network in the South of Vietnam to connect RE sources.
The project will create additional capacity to increase the existing hydropower plant’s power generation capacity from 720MW to 1,080MW to meet the country’s demand for electricity.