Tri An Hydro Power Plant extension


Project supervision support consultant in these activities: 


- Support bidding, design, and construction supervision.

- Financier assistance: ESH disbursements, and stakeholder coordination.

- On-site guidance and quality assurance to comply with cofinancier's standards.

- Dam safety panel of expert
 

January 2026 - December 2026
Low Carbon Infrastructure and Development PASA – Hydropower Expansion Master Plan

The activity provides a preliminary assessment of opportunities to expand installed capacity across eight hydropower projects in Viet Nam.

January 2025 - December 2025
Low Carbon Infrastructure and Development PASA – Hydropower, Pumped Storage and Floating Solar Expansion

The activity assesses how hydropower, pumped storage and floating solar PV can be expanded and combined with variable renewable energy to support reliable electricity supply and stable operation of Viet Nam’s power system.

January 2025 - December 2025
Hydropower Reservoir Monitoring and Decision-Support System for the Hong–Thai Binh River Basin

The project combines infrastructure investment and technical assistance to improve the management of large hydropower reservoirs through real-time monitoring, supervision and decision-support systems in the Hong–Thai Binh River Basin.

January 2023 - December 2026
Expansion of Hoa Binh Hydropower plant

The two main objectives of this project are : 1. Optimize hydropower to increase electricity production, and to improve the supply and stability of the electricity system. 2. Contribute to replacing fossil fuel production for an estimated 488 gigawatts per year, thus avoiding the release of some 225,000 tons of CO2 equivalent emissions into the atmosphere.

January 2021 - January 2025
Technical assistance to EVN in the fields of ESHS management and construction as part of the Hoa Binh hydropower plant extension project

The TA aims at supporting EVN in key aspects related to E&S management and technical construction support, as part of the Hoa Binh hydropower plant extension project under AFD's financing

 

January 2020 - January 2023
Agus-Pulangi Hydropower Complex

To restore the capacity of the generation units, increase the availability of clean electricity, and strengthen the safety of the da ms of the Agus-Pulangi Hydropower Complex

January 2019 - December 2024
Supporting hydroelectric electricity production increase in Vietnam

Together wih AFD, it is about accompanying the extension of laly powerplant (laly ll project Gia Lai Province) that will increase the capacity of the power plant by around 360 MW (+50%).

January 2019 - December 2025