PROJECT DESCRIPTION
The proposed project aims to support PLN in developing about 950 circuit-kilometer high-voltage (275 kilovolt) backbone transmission lines infrastructures including the necessary substations. This covers 275 kilovolt transmission lines, some connections to integrate the existing 150 kV transmission lines, 275 kV substation, and 150 kV substation. This project will establish a transmission backbone to channel clean energy to the load center in the southern part of Sulawesi, hence increasing electricity demand in this region. It is anticipated that this project will eventually connect to the power system in Southeast Sulawesi in the future.
ADDITIONAL INFORMATION
The start date is set to the proposed year and end date is set to 31 December 2050 as the timeline is not available yet. For more information, please visit https//www.adb.org/projects/59082-001/main