Showing 1-10 of 12 Export Projects export Click here to download the selected projects in excel format. You may adapt the selection by applying the filters on the left. Show Sort by

Feasibility Study on PLN’s Indonesia-Malaysia Cross-border Interconnection Project

The U.S. Trade and Development Agency (USTDA) signed a grant agreement with Indonesian national utility PT Perusahaan Listrik Negara (PLN) for a feasibility study to support of the development of two cross-border power interconnections between Indonesia and Malaysia. The project, which advances a key power sector objective for the Association of Southeast Asian Nations (ASEAN), will facilitate efficient resource sharing to help meet growing energy demands, enhance energy security, and implement policies for clean energy and climate protection goals in both countries.

 

March 2024 - December 2026
ASEAN Power Grid Transmission System Operator (ATSO)

This project studies the formation of the ASEAN Power Grid Transmission System Operator Institution (ATSO). It provides an overview of the international case examples that have been used as a basis in creating the ATSO project deliverables. The project is aligned and coordinated with the deliverables from the Study on the Formation of the ASEAN Power Grid Generation and Transmission System Planning Institution (AGTP).

January 2020 - January 2021
Collaboration Program for Disseminating Japanese Technology for Electricity Distribution System and Management in the Philippines

Improve distribution system reliability of Electric Cooperatives with Distribution Network Mangement System (DNMS) 

January 2018 - December 2019
Phu Lac Wind Farm

Construction and operation of Wind Farm in Phu Lac (BinhThuan Province) – 24MW.

January 2013 - December 2018
Geothermal Energy Upstream Development: Civil Infrastructure Feed of Jailolo Exploration Drilling

The development objective of Geothermal Energy Upstream Development Project for Indonesia is to facilitate investment in geothermal power generation and reduce greenhouse gas emissions. This project has two components. 1) The first component, Risk Mitigation for Geothermal Exploration Drilling, will finance a program of activities designed to support geothermal exploration drilling in Indonesia, through: (a) drilling of exploration and confirmation wells; (b) constructing access roads and other associated infrastructure to facilitate the drilling activities, at select geothermal sites; and (c) implementation of measures set forth in the Safeguards Instruments. 2) The second component, Capacity Building on Geothermal Exploration and Environmental and Social Safeguards Management, will finance a program of capacity building designed to establish an efficient and effective geothermal energy exploration and tendering program.

January 2018 - December 2021
Power Interconnection Investment Program

Strengthening of medium and high voltage transmission system in Indonesia 

January 2022 - December 2023
ASEAN Distributed Power Project (Phase 2)

The project involves the execution and operation of distributed and utility-scale solar, wind, biomass, waste-to-energy, gas-fired power, energy storage, and associated infrastructure in countries in the ASEAN region and other developing member countries (DMCs).

January 2017 - December 2024
Ha Noi and Ho Chi Minh City Power Transmission Development Sector project

To improve the capacities of HNCP and HCMPC and development and rehabilitate its 220KV and 110KV transmission lines. It is co-financed by ADB with Asean Infrastructure Fund (AIF) and US$100 million from Vietnam Government.

Key output
(i) Strengthened institutional capacities of HNPC and HCMPC
(ii) Development and rehabilitation of 220 kV and 110 kV transmission lines and substations of Ha Noi and Ho Chi Minh City.
 

January 2014 - December 2020
Power Transmission Investment Program–Tranche 3

The Asian Development Bank is working with Viet Nam to improve the transmission network to balance power loads in northern, central, and southern Viet Nam. 
Key output 
1.) upgrading 500 kilovat and 220 kilovat transmission lines 
2.) improving the operational effectiveness and efficiency of the National Power Transmission Corporation

January 2015 - February 2021
Power Transmission Investment Program–Tranche 2

The second tranche of the multitranche loan facility will finance the expansion of the transmission network, improve the operational effectiveness and efficiency of the National Power Transmission Corporation, and project implementation support.
The outut is Construction of 437 km of 500 KV transmission line and 28.2 km of 220kV

January 2012 - March 2017