PROJECT DESCRIPTION
Gajahmungkur Floating Solar Project: 100MWac floating solar PV plant to be built on the surface of the Gajahmungkur reservoir, Wonogiri Regency, Central Java which is currently used by a hydroelectric power plant owned by Perum Jasa Tirta I, one of the Sponsors of Gajahmungkur Floating Solar Project. The total surface area required for development is 250 hectares. The transmission line for Gajahmungkur floating solar PV plant is connected to Nguntoronadi 150 kV Substation. The distance to the nearest switchyard is approximately 11.7 kilometers from the floating PV site. Banyuwangi Ground-Mounted Solar Project: 100MWac ground mounted solar PV plant to be built in Banyuwangi Regency, East Java. The transmission line for the Banyuwangi PV plant is connected to Banyuwangi 150 kV Substation. The distance to the nearest switchyard is approximately 4 kilometers from the PV site.
ADDITIONAL INFORMATION
The project end date is set as 31 December 2050 as the timeline is not available. For more information, please visit https//www.adb.org/projects/59069-001/main#project-pds