Expansion of Hoa Binh Hydropower plant

The two main objectives of this project are : 1. Optimize hydropower to increase electricity production, and to improve the supply and stability of the electricity system. 2. Contribute to replacing fossil fuel production for an estimated 488 gigawatts per year, thus avoiding the release of some 225,000 tons of CO2 equivalent emissions into the atmosphere.

January 2021 - January 2025
Technical assistance to EVN in the fields of ESHS management and construction as part of the Hoa Binh hydropower plant extension project

The TA aims at supporting EVN in key aspects related to E&S management and technical construction support, as part of the Hoa Binh hydropower plant extension project under AFD's financing

 

January 2020 - January 2023
Grid strengthenig project in the South of Vietnam

Improve, build, extend the 110kV grid network in the South of Vietnam to connect RE sources.

January 2022 - January 2025
Technical assistance to EVN in the fields of Health, Safety, Environment (HSE) and Operation & Maintenance (O&M)

This project aims to improve peak load supply and the electricity system stability, reinforcing its availability to integrate more renewable energy. It will also contribute to replacing the fossil production (estimated at 220GWh/year) and avoid 68 kt of greenhouse gases emission per year.

January 2019 - January 2025
Expansion of Ialy Hydropower plant

The project will create additional capacity to increase the existing hydropower plant’s power generation capacity from 720MW to 1,080MW to meet the country’s demand for electricity.

 

January 2021 - January 2025
Construction of Se San 4 solar power plant

Se San 4 Solar Power Plant Project with a capacity of 49MWp was officially connected to the national power system. By design, the plant will contribute annually an average of 72.4 million kWh to the power system.

January 2019 - January 2021
Future Energy - Vietnam

The forum will discuss the energy transition of Vietnam and Australia and introduce new energy technologies and solutions from Australia.

January 2023 - December 2023
Energy Efficiency Lighting NAMA Pilot in Hue City

In March 2016, the Luxembourg Development Cooperation Agency (LuxDev) was mandated by the Ministry of Foreign and European Affairs (MFEA), on behalf of the Luxembourg Climate and Energy Fund (CEF) led by the Ministry of Sustainable Development and Infrastructure (MSDI), to formulate a mitigation intervention through piloting of an EE lighting NAMA in Hue City. VIE/401 will contribute to national and local Green Growth, Climate Change and Energy Efficiency Target Programmes.

January 2018 - December 2022
Data Collection Survey on Power Sector in Vietnam

This survey comprehensively collects information necessary for examining the direction of medium- to long-term assistance for Vietnam in the power sector. In particular, it will consolidate and prioritize possible support measures from the perspectives of private sector partnerships such as overseas
investment and loans, ODA loans, and technical assistance. In addition, it aims to examine the details of cooperation programs for which assistance can be provided in the short term. 
Main outcomes are following : 
1. To analyze the current status of power & energy sector
2. To analyze the issues caused by RE development
3. To identify and prioritize JICA’s future cooperation

January 2019 - December 2020
Efficient Power Grids in small & medium sized cities I+II (Rural Grids III)

1. This Invitation for Bids follows the General Procurement Notice for this project that appeared in the “KfW Business Opportunities” on issue number 201468032.

2. The Socialist Republic of Vietnam has received a loan from the KfW toward the cost of Efficient power grids in small and medium- sized cities project - Phase 1, Loan Agreement signed on October 10, 2016 between KfW and Government of the Socialist Republic of Vietnam, and it intends to apply part of the proceeds of this loan to payments under the contract on this Project. The Central Power Corporation (EVNCPC) (“the Purchaser”) now invites sealed Bids from eligible Bidders for the supply of materials and equipment of the following packages for the Projects “Project Efficient Power Grids in Small and Medium-Sized Cities – Phase 1” which will be built in Gia Lai, Dak Nong, Dak Lak, Quang Binh, Binh Dinh provinces and Da Nang city in central region of Viet Nam

January 2016 - December 2022