SIPET information loading

Project Mapping Tool

FILTERS

Browse Content

Filter By: Reset

Project Type


Support Type


Implementing Agency or Agencies


Government Partner


Donors (or Funding/ Contributing Organizations)


Sectors or Areas of Work


Keywords


Region/Location

PROJECT LIST

Showing 1-10 of 41 Export Projects export Click here to download the selected projects in excel format. You may adapt the selection by applying the filters on the left. Show Sort by

Ninh Binh 300 MW flexible power plant

The plant will use Reciprocating Internal Combustion Engine (RICE) technology to replace an old coal power plant. It will provide flexibility to the power system, support the integration of renewable energy.

January 2026 - December 2027
Tri An Hydro Power Plant extension


Project supervision support consultant in these activities: 


- Support bidding, design, and construction supervision.

- Financier assistance: ESH disbursements, and stakeholder coordination.

- On-site guidance and quality assurance to comply with cofinancier's standards.

- Dam safety panel of expert
 

January 2026 - December 2026
Low Carbon Infrastructure and Development PASA – Clean Energy Transition and Financial Sustainability

This policy note develops recommendations for implementing Viet Nam’s clean-energy transition while maintaining the financial sustainability of power-sector utilities and the wider sector.

January 2025 - December 2025
Low Carbon Infrastructure and Development PASA – EVN Procurement Data Analytics

The activity aims to strengthen Vietnam Electricity’s procurement performance through the application of data analytics.

January 2025 - December 2025
Low Carbon Infrastructure and Development PASA – Hydropower Expansion Master Plan

The activity provides a preliminary assessment of opportunities to expand installed capacity across eight hydropower projects in Viet Nam.

January 2025 - December 2025
Low Carbon Infrastructure and Development PASA – Hydropower, Pumped Storage and Floating Solar Expansion

The activity assesses how hydropower, pumped storage and floating solar PV can be expanded and combined with variable renewable energy to support reliable electricity supply and stable operation of Viet Nam’s power system.

January 2025 - December 2025
Construction of the Bac Ai pump-storage hydropower plant

Construction of the Bac Ai pump storage hydropower plant of 1200MW - the first pump storage of its kind in Vietnam. The project will be used as reservice capacities for the Vietnamese power system, thus reinforcing its stability, regulating daily loads and supporting the integration of new renewables into the system.

January 2024 - December 2031
Bac Ai Pump Storage Power Plant (cofinancing with AFD, EIB & JICA)

The role and function of the pumped storage power plant is storing power in off-peak time at night and generating power in peak time, so it can adjust the balance of supply /demand and reduce the demand difference between peak and off-peak time. In general, PSPP is capable of flattening the load curve

January 2024 - December 2032
Rural Electrification

Project preparatory technical assistance reports are provided for small-scale technical assistance that identify, formulate, and prepare development projects.

December 2023 - December 2024
Reinforcement of EVNNPTs transmission grid

The project promotes the development of transmission capacities in the provinces close to Ho-Chi-Minh-city and includes a number of investment projects at 500kV level (substations and transmission lines). The projects under AFD's financing aim at strengthening EVNNPT's transmission capacities in the provinces by reinforcing the current system, improving its reliability and efficiency.

January 2023 - December 2027